
Add to Cart
GRADE DH36 LR BULB FLAT FOR SHIPBUILDING
Bulb flats are the most cost-effective, efficient and corrosion-resistant solution for plate stiffening. They deliver buckling resistance at a lower weight than flat bars or angles and thanks to their rounded edges, there is no need for edge grinding before painting, saving time and money.
The bulb flat are mainly used on shipbuilding, bridge construction, offshore plateform.
Specification:
Size(mm) | HP80-HP430 |
Standard: | EN10067:1997 |
Grade: | A,B,D,E,AH32,AH36,DH32,DH36,EH32,EH36 |
S235JR, S235J0, S235J2 | |
S275JR, S275J0, S275J2 | |
S355JR, S355J0, S355J2, S355K2 | |
Certification: | ABS, CCS,LR,KR,NK,RINA,BV,DNV-GL,RMRS CE Certification |
Length: | 6m-20m, according to customer's request |
Application: | Hull Structure , Bridge Structure, Offshore Platform |
Sizes of Bulb Flat:
Size(mm) | Unit Weight(kg/m) | Lead time |
80*6 | 4.88 | every 6 months one production. Keep stock. |
80*7 | 5.51 | |
100*6 | 6.08 | 45-60 days |
100*7 | 6.86 | 45-60 days |
100*8 | 7.65 | 45-60 days |
120*6 | 7.32 | 45-60 days |
120*7 | 8.26 | 45-60 days |
120*8 | 9.20 | 45-60 days |
140*7 | 9.75 | 45-60 days |
140*8 | 10.85 | 45-60 days |
140*9 | 11.95 | 45-60 days |
140*10 | 13.05 | 45-60 days |
160*7 | 11.46 | 45-60 days |
160*8 | 12.72 | 45-60 days |
160*9 | 13.97 | 45-60 days |
160*10 | 15.23 | 45-60 days |
160*11 | 16.49 | 45-60 days |
180*8 | 14.80 | 45-60 days |
180*9 | 16.22 | 45-60 days |
180*10 | 17.63 | 45-60 days |
180*11 | 19.04 | 45-60 days |
200*9 | 18.57 | 45-60 days |
200*10 | 20.14 | 45-60 days |
200*11 | 21.71 | 45-60 days |
200*12 | 23.28 | 45-60 days |
220*10 | 22.77 | 45-60 days |
220*11 | 24.50 | 45-60 days |
220*12 | 26.22 | 45-60 days |
240*10 | 25.50 | 45-60 days |
240*11 | 27.39 | 45-60 days |
240*12 | 29.27 | 45-60 days |
260*10 | 28.35 | 45-60 days |
260*11 | 30.39 | 45-60 days |
260*12 | 32.43 | 45-60 days |
280*11 | 33.50 | 45-60 days |
280*12 | 35.70 | 45-60 days |
280*13 | 37.90 | 45-60 days |
280*14 | 40.10 | 45-60 days |
300*11 | 36.70 | 45-60 days |
300*12 | 39.09 | 45-60 days |
300*13 | 41.44 | 45-60 days |
320*12 | 42.60 | 45-60 days |
320*13 | 45.09 | 45-60 days |
320*14 | 47.60 | 45-60 days |
340*12 | 46.20 | 45-60 days |
340*13 | 48.86 | 45-60 days |
340*14 | 51.50 | 45-60 days |
370*13 | 54.70 | 4 months per production. Keep stock. |
370*14 | 57.60 | |
370*15 | 60.50 | |
400*14 | 63.96 | |
400*15 | 67.10 | |
400*16 | 70.20 | |
430*14 | 70.60 | 1 or 2 years per production. Keep stock. |
430*15 | 73.90 | |
430*17 | 80.70 | |
430*19 | 87.40 |
Arrange perfect logistics , by bulk carrier or by contianers: